3. Just after rig positioning, generate the casing into the bottom. Generate metal casing to the least a depth of one m down below the bottom stage to take lateral hundreds and actions at site. The metal casing also overcome issues as a consequence of groundwater during piling.The construction approach contains drilling the borehole, fabrication an